spares-parts / Carbon Coaters and Accessories

115V Fuse
115V Fuse

16020007

Four are required

K400X, K450X, K950X

5 days

115V Fuse Pack
115V Fuse Pack

AL250078-1

Two each of T1A and T10A ceramic fuses

K250

5 days

230V Fuse
230V Fuse

16020003

Four are required for the T10A ceramic fuse

K400X, K450X, K950X

5 days

230V Fuse Pack
230V Fuse Pack

AL250079-1

Two each of T5A and T620mA ceramic fuses

K250

5 days

Carbon Fibre Head - Complete O ring Kit
Carbon Fibre Head - Complete O ring Kit

CA076F-OKIT

Contents: five O rings and two L gaskets

CA076F

5 days

Carbon Fibre Head - O ring Set - SC7620
Carbon Fibre Head - O ring Set - SC7620

CA762F-OKIT

Contents: six O rings for carbon fibre accessory on SC7620 Sputter Coater

SC7620, CA762F

5 days

Carbon Rod Head - Complete O ring Kit
Carbon Rod Head - Complete O ring Kit

CA076R-OKIT

Contents: three O rings and two L gaskets

CA076R

5 days

Coat Supply Leads
Coat Supply Leads

AL207014-1

Two are required

K400X, K450X

1 week

Transformer - 10V x 2 x 50A
Transformer - 10V x 2 x 50A

416201020

High current transformer

CC7650, CA7625

4-6 weeks

Replacement Spring Kit
Replacement Spring Kit

AL250077-1

Terminal posts, clamps and key plates may also be required

K250, K400X, K450X

5 days

O ring
O ring

51000065

Door O ring

K975X

5 days

Head Service Kit
Head Service Kit

CA076R-SERVICE KIT

Contents: O ring set, L gaskets, springs and insulators, LT cable

CA076R

5 days

Rotary Stage O ring Kit
Rotary Stage O ring Kit

AL410331-1

Set of four O rings

K975X

5 days

Terminal Key Plate
Terminal Key Plate

A4200030

Terminal clamps, posts and replacement spring kit may also be required

K250, K400X, K450X

5 days

LT Braid Assembly
LT Braid Assembly

AL407115-1

Two sets are required

K950X

1 week

Evaporator Control PCB
Evaporator Control PCB

AL001233-3

Evaporator control PCB assembly

K400X, K450X, K950X

4-6 weeks

Head Service Kit
Head Service Kit

CA076F SERVICE KIT

Contents: O ring set, L gaskets, clamp springs, clamp and insulators, LT cable

CA076F

5 days

Quadring Seal
Quadring Seal

51000063

Shutter shaft quadring seal

K400X, K450X

5 days

Evaporate Drive PCB
Evaporate Drive PCB

AL001227-5

Standard evaporation PCB assembly

K400X, K450X, K950X

4-6 weeks

Compression Spring
Compression Spring

14570006

Stainless steel spring used in K950X carbon coating head

K950X

5 days

Control PCB Assembly
Control PCB Assembly

AL410002-2

K975X only

K975X

4-6 weeks

Terminal O rings
Terminal O rings

51000008

Four are required for the K250, K400X and K450X, two are required for the K950X

K250, K400X, K450X

5 days

Head Service Kit
Head Service Kit

CA762F-SERVICE KIT

Contents: O ring set, clamp springs, clamp and insulators, LT cable

SC7620, CA762F

5 days

Glass Cylinder
Glass Cylinder

G6301

9" diameter x 200mm H

K975X

1-2 weeks

Insulated Braid Assembly
Insulated Braid Assembly

AL410108

Chamber LT lead

K975X

1 week

Evaporate Drive Module PCB
Evaporate Drive Module PCB

AL001226-2

PCB assembly

K975X

4-6 weeks

Coat Supply Leads
Coat Supply Leads

AL250076-1

Two are required

K250

1 week

Complete set of fuses for carbon coater or CA7625 PSU
Complete set of fuses for carbon coater or CA7625 PSU

CCFUSE KIT

Contents: two of 2A, 3.15A ,5A, 10A 20mm, 10A 1.25", 15A

CC7650, CA7625

Normally in stock

Compact Full Range Pirani Gauge
Compact Full Range Pirani Gauge

50100011

Pfeiffer full range gauge

K975X

1-2 weeks

Terminal Post
Terminal Post

A4200028

Terminal clamps, key and replacement spring kit may also be required. (Two posts and clamps needed)

K250, K400X, K450X

5 days

Meter Current - 100A
Meter Current - 100A

407145050

Front panel meter

CC7650, CA7625

4-6 weeks

Terminal Clamp
Terminal Clamp

A4200029

Terminal posts, key and replacement spring kit may also be required. (Two posts and clamps needed)

K250, K400X, K450X

5 days